Property repair management: from request to closure
Property repair management: centralise requests, decide who pays, assess urgency, follow contractors and close each job with proof.
The homePad team
Property repair management means following each repair request from the moment it is reported until it is closed: centralise, assess the urgency, decide who pays, order in writing, check the work and match the invoice. Most of the time lost comes from requests scattered across phone calls, emails and text messages, and from files that nobody closes. The method that follows works with a spreadsheet as well as with specialist software.
Repair request: a report of a fault or damage in a home or a building that calls for a repair.
Tenant's repairs: routine maintenance and minor repairs payable by the tenant; each country defines them, often with an indicative list (see the box below).
Work order (or purchase order): a written document that tells the contractor what to do, where, within what time and for what maximum amount.
How do you centralise repair requests?
Set a single point of entry or, failing that, a single register in which every request is entered the same day, whatever the channel. As long as requests live in several inboxes, nobody knows how many are open. A usable request always contains:
- the property, the unit and the room concerned;
- the occupant's description of the problem, with at least one photo;
- the date of the report and who made it;
- the contact details and the times available for access to the home.
"Leak in the bathroom" does not say whether the water comes from the basin trap, the shower hose or the ceiling, and therefore perhaps from the upstairs neighbour. A photo and a sentence are often enough to send the right trade the first time.
Who pays for repairs: the landlord or the tenant?
In all four countries, the tenant pays for routine maintenance and minor repairs, and the landlord pays for the other repairs, including minor repairs due to wear and tear or force majeure. Settle this point before ordering: nobody wants to pay a disputed invoice.
| Repair | As a rule, payable by | Good to know |
|---|---|---|
| Replacing a seal or a shower hose | Tenant | Minor repair from everyday use |
| Unblocking a sink or a toilet | Tenant | Unless the shared stack is blocked |
| Light bulbs, fuses, sockets, switches | Tenant | Unless the installation is faulty |
| Annual servicing of an individual boiler | Tenant | Depending on the lease; keep the certificate |
| Replacing a boiler at the end of its life | Landlord | Wear and tear |
| Broken window pane | Tenant | Unless due to a fortuitous event or force majeure |
| Roller shutter strap or slats | Tenant | Worn motor or curtain: landlord |
| Water coming in through the roof or the façade | Landlord or co-ownership | Common areas: go through the managing agent or administrator |
| Bringing the electrics up to standard | Landlord | Safety standards for the home |
Tenant: routine maintenance, minor repairs and tenant's repairs, except in the case of wear and tear, poor workmanship, a construction defect, a fortuitous event or force majeure (art. 7 d of law no. 89-462 of 6 July 1989; indicative list in decree no. 87-712 of 26 August 1987). Landlord: the other repairs (art. 6 c) and a decent home (decree no. 2002-120).
Tenant: minor cleaning and repair work forming part of normal maintenance, according to local custom (art. 259 CO); they report the other defects (art. 257g). Landlord: maintenance of the property (art. 256). There is neither a list nor a ceiling in the Swiss Code of Obligations; cantonal customs give details, such as art. 9 of the Vaud Rules and Customs on Leasing (RULV, version in force since 1 July 2026).
- Brussels: tenant's repairs and minor maintenance payable by the tenant, except in the case of wear and tear or force majeure; the rest by the landlord (art. 223 of the Brussels Housing Code; mandatory list: order of 23 November 2017).
- Wallonia: repairs "of minor importance" payable by the tenant (art. 15 of the decree of 15 March 2018); the rest and wear and tear payable by the landlord (art. 7 and 8); non-exhaustive list: Walloon Government order of 28 June 2018.
- Flanders: small repairs payable by the tenant (art. 26 of the Vlaams Woninghuurdecreet), the rest and wear and tear payable by the landlord (art. 25 and 26); list: annex 1 to the Flemish Government order of 7 December 2018.
Landlord: repairs other than tenant's repairs (art. 1720 of the Civil Code). Tenant: tenant's repairs as determined by local custom (art. 1754), except in the case of wear and tear or force majeure (art. 1755).
Water damage also follows the insurance route: the occupant reports it to their insurer without delay. To assess the wear and tear of a piece of equipment, the move-in inspection report and the repair history are your best evidence.
Report within the time limit in the policy, never less than 5 working days (art. L113-2 of the Insurance Code); IRSI agreement between insurers since 1 June 2018, up to €5,000 excluding VAT; tenant's liability insurance is mandatory (art. 7 g of the 1989 law).
Insurance depends on the lease and on cantonal law. In the canton of Vaud, buildings and contents must be insured against fire and natural hazards with the ECA (art. 1a, 6 and 6a LAIEN), and both landlord and tenant must hold liability insurance (art. 5 RULV).
Tenant's insurance is mandatory: fire and water damage in Brussels (art. 220/1 of the Brussels Housing Code, since 1 November 2024), fire in Wallonia (art. 17 of the 2018 decree), fire and water damage in Flanders (art. 29 of the Vlaams Woninghuurdecreet, which also requires the landlord to insure its liability).
The tenant is liable for fire unless proven otherwise (art. 1733 of the Civil Code); no insurance is required by law, but landlords often ask for a certificate of insurance.
How do you assess the urgency of a repair?
Define three or four written levels of urgency, known to the whole team, and give each one a response time that you commit to keeping. The times below are examples to adapt to your mandates and your contractors.
| Level | Examples | Response time (example) |
|---|---|---|
| 1. Danger or ongoing damage | Active leak, smell of gas, front door broken in | Same day |
| 2. Essential equipment out of order | No hot water, heating down in winter, only toilet blocked | 24 to 48 hours |
| 3. Inconvenience that is not getting worse | Jammed shutter, dripping tap | Within a week |
| 4. Comfort or improvement | Replacing equipment that still works | Scheduled |
How do you order and track a repair through to closure?
Always order in writing, then take each repair through simple stages, each one with a piece of evidence kept on file. The work order states the address and access arrangements, the description and photos, the limits of the job, the expected timescale and the amount above which a quote is required.
Agree with each owner, in the mandate or in writing, the threshold below which you order without consulting them. Above it, ask for a quote, and for several where the works are substantial.
| Stage | Trigger | Evidence to keep |
|---|---|---|
| 1. Received | Report | Photo, date, who reported it |
| 2. Assessed | Urgency and who pays decided | Written decision |
| 3. Ordered | Work order sent | Work order, accepted quote, owner's agreement |
| 4. Scheduled | Appointment confirmed with the occupant | Date and time slot |
| 5. Carried out | Contractor reports the job finished | Report and photos after the works |
| 6. Checked | Inspection or confirmation from the occupant | Written confirmation, photo |
| 7. Invoiced | Invoice matched against the quote | Invoice |
| 8. Closed | Payment approved | Complete file archived |
Every open request has a person in charge and a next deadline; review each week those that have not moved. Inform the occupant at each change of stage: it is the simplest way to avoid chasing calls.
The occupant must allow necessary repairs to be carried out; notice and rent reductions for long works vary from country to country:
Access must be given after written notice; no works on Saturdays, Sundays or public holidays without express agreement (art. 7 e of the 1989 law); rent is reduced beyond 21 days (art. 1724 of the Civil Code).
Works announced in good time must be tolerated (art. 257h CO); proportional rent reduction for as long as the defect lasts, with no minimum duration (art. 259d).
Rent is reduced beyond 40 days in Brussels (art. 1724 of the old Civil Code; art. 221 of the Brussels Housing Code for energy works) and in Wallonia (art. 21 of the 2018 decree); beyond 30 days in Flanders (art. 27 of the Vlaams Woninghuurdecreet). The reduction is proportionate to the duration and to the part of the home the tenant cannot use.
Rent is reduced beyond 40 days of urgent repairs (art. 1724 of the Civil Code).
Repair records contain personal data: treat them with the same rigour as the rest of the file (see our GDPR checklist).
How do you plan ahead for works arising from a move-out inspection?
Ask for quotes on the day of the move-out inspection: the deposit deadlines leave no time to wait, and any deduction must be justified.
Deposit returned within one month if the move-out matches the move-in, two months otherwise (art. 22 of the 1989 law).
Defects must be reported to the tenant immediately when the property is returned, failing which the tenant is released (art. 267a CO).
Brussels: release no later than two months after the keys are handed back, unless there is a dispute (art. 249 of the Brussels Housing Code). Wallonia (art. 62 of the 2018 decree) and Flanders (art. 37 of the Vlaams Woninghuurdecreet): no time limit in figures; the deposit is released on a written agreement, drawn up at the earliest at the end of the lease, or on a court decision.
Where the move-out inspection report matches the move-in one, subject to normal wear and tear, and the landlord makes no claim for unpaid rent or rental damage, half of the deposit is returned within one month of the handover of the keys; the balance, after deduction of duly justified sums, no later than one month after receipt of the service charge statements or the final approval of the co-ownership's annual accounts (art. 5, paragraph 2bis, of the amended law of 21 September 2006). In the event of a dispute, the justice of the peace has jurisdiction (art. 19).
Turn each defect found into a repair request, then move straight on to the reletting works while the home is vacant. A works report prepared by AI speeds up this step, provided you reread it.
Which property repair management KPIs should you track, and which mistakes should you avoid?
Three indicators are enough to start with: the time between report and closure for each urgency level, the number of requests open for more than a month, and the cost per property and per type of repair. Record them before changing the way you are organised, then every quarter.
Ordering by phone. If there is a disagreement over the price or the scope of the works, no trace remains.
Closing when the invoice arrives. The invoice proves that the contractor has invoiced. Only the check proves that the fault is repaired.
Leaving the occupant without news. They will call back, or turn to the owner.
Treating each request in isolation. Three breakdowns of the same boiler in one winter are a single issue: repair again or replace. The history for each property, with dates, photos and invoices, makes it visible.
What homePad does for you
homePad Resolve, included in the Entreprise plan, centralises repair requests and contractor follow-up. A request can also arise from a visit report, which links the inspection report to the works.
- homePad Resolve: occupants, whether tenants or cleaning staff, report an incident through a web app; the property manager approves the request.
- Management of quotes and cost estimates, contractors steered in a shared space, real-time tracking and automatic archiving.
- A request can start directly from the works noted in a report; in the field, homePad App generates a works report with AI and suggests a cost estimate, to be approved.
- homePad One: dashboards, KPIs and an open API to your management software.
- See also our pages for social housing landlords, student residences and subcontractors.
Frequently asked questions
Who pays for repairs in a rented home, the landlord or the tenant?
The tenant pays for routine maintenance and minor repairs; the landlord pays for the others, and for those due to wear and tear or force majeure. Legal texts and lists by country: see the "Who pays" box above.
How long does a landlord have to carry out repairs?
The law generally sets no time limit in figures: the landlord must act within a reasonable time given the urgency. The tenant first gives formal notice in writing, then:
Departmental conciliation commission, then the judge for protection disputes (juge des contentieux de la protection); the tenant keeps paying the rent and may not suspend it on their own initiative.
Termination or repair at the landlord's expense after a reasonable time (art. 259b CO), payment of the rent into a blocked account (art. 259g).
Justice of the peace. In Wallonia, withholding part of the rent, in proportion to the harm, first requires notice and then a formal demand by registered letter, and exposes the tenant to a claim for termination: going to the justice of the peace is safer.
Justice of the peace for disputes up to €10,000, district court above that.
Can a tenant refuse access for repairs?
As a rule, no, for necessary repairs, if they have been given notice. Notice periods, permitted days and rent reductions vary from country to country (see the box on works above). Schedule the works with the tenant.
Who do you contact about a leak coming from the flat upstairs?
The occupant reports the claim to their own insurer and fills in the joint claim form provided by insurers with the neighbour. The property manager has the source of the leak traced and, if it affects a shared pipe, informs the co-ownership's managing agent or administrator.
Do you need a quote for every repair?
No. Agree with each owner a threshold below which you order without a quote. Above it, ask for a written quote, and several for substantial works, then match the invoice against the quote before approving it.
How do you track repairs across several contractors?
With a single register in which each request has a status, a person in charge and a next deadline, and in which the contractor updates its progress. A weekly review of requests that have not moved is enough to avoid most oversights.